Insulated metal panel freezer warehouse interior built for a Parker County distribution facility
Home > Service Areas > Weatherford & Parker County

COLD STORAGE WAREHOUSES IN WEATHERFORD & PARKER COUNTY

PanelTX is based in Parker County. We build refrigerated and freezer warehouse facilities here — insulated panel envelopes, cold docks, and the glycol underfloor systems that keep a freezer slab from heaving. When the job is down the road, the crew and the panel stock are already here.

What We Build for Warehouse Facilities

FREEZER & COOLER WAREHOUSE ENVELOPESLarge-format insulated metal panel shells for refrigerated and frozen warehouse space, R-14 through R-48. Long-span panels cut the secondary framing and leave fewer joints in the envelope.
GLYCOL UNDERFLOOR FROST PREVENTIONPEX glycol tubing laid below the slab insulation, circulating a warmed glycol solution that keeps the subgrade above freezing. It is what stops a freezer floor from heaving — and it has to go in before the pour.
REFRIGERATED DOCKS & DOORSConditioned dock and staging areas that close the gap where cold chain breaks, plus heavy plug doors and traffic openings sized for forklift and pallet-jack use.
LOCAL SHOP, LOCAL CREWSOur panel stock, our fabrication, and our installation crews are all in Parker County. A Weatherford project does not wait on freight from another state or a crew finishing somewhere else.

The Freezer Floor Problem Nobody Sees Until It Is Too Late

A freezer built on grade is slowly refrigerating the ground underneath it. Insulation below the slab slows that down, but it does not stop it — it only delays how long the frost front takes to work its way into the soil.

Once the subgrade freezes, the water in it expands. The ground lifts. That lift is not even across the slab, so what you get is a floor that heaves in the middle or at one end, cracks along the high points, doors that stop closing square, and racking that comes out of plumb. By the time it is visible, the fix is demolition of the floor. There is no patch for frost heave.

A glycol loop is how you prevent it. PEX tubing is laid in a grid beneath the slab insulation and a warmed glycol and water solution is circulated through it continuously, holding the subgrade a few degrees above freezing. The frost front never reaches the soil, so the ground never moves.

Glycol is the better system over the life of a building than the electric resistance cable sometimes used instead. It runs on far less energy, it can often reclaim waste heat off the refrigeration system rather than buying heat outright, and — the part that matters most — the mechanical parts that can fail are a pump and a manifold you can reach. Buried resistance cable that fails is under a hundred yards of concrete.

The design points that actually decide whether it works: tube spacing and loop lengths sized to the slab, the manifold located outside the freezer envelope where it can be serviced without entering the cold space, subgrade temperature sensors so you know the system is doing its job rather than assuming, and the right glycol concentration for the temperature you are holding.

The one thing to know: this cannot be retrofitted. The tubing goes in before the slab is poured. If you are planning a freezer facility in Parker County and the concrete is scheduled, that decision needs making now — not after the building is up.

Weatherford Cold Warehouse Questions

Does every freezer need an underfloor glycol system?Not every one. A small freezer on an insulated raised floor does not. Any sizeable freezer built on grade and held below freezing does, and the larger the slab the less optional it becomes. We will tell you honestly which category your building falls into.
Can glycol tubing be added to an existing slab?No. It goes beneath the slab, so it has to be installed before the pour. If you already have a heaving floor, the conversation is about floor replacement instead — which is exactly why this gets decided early.
Glycol loop or electric heat cable?Glycol, for most buildings. Lower operating cost, the option to reclaim waste heat from the refrigeration system, and serviceable components you can actually reach. Buried resistance cable that fails cannot be replaced without breaking concrete.
How close are you to Weatherford?We are in Parker County. Our shop, our panel stock, and our crews are all here, so a local project does not queue behind freight from out of state or a crew finishing a job in another market.

What a Warehouse Build Uses

Cold Room Panels

Large-format panels and glycol freezer floor systems.

Cold room panels →

Insulated Wall Panels

Long-span wall and roof panels for the building envelope.

Insulated panels →

Panel Manufacturers

The five lines we install, two of them made in North Texas.

Panel manufacturers →

Grocery and Distribution

Warehouse-scale cold rooms and refrigerated docks.

Grocery cold storage →

Building a Cold Warehouse in Parker County?

If the slab has not been poured, call us now — the underfloor decision has to be made before the concrete. We will walk the site and price the envelope, the floor system, the doors, and the refrigeration as one scope. 682-402-4080.

Get a Free Quote